CB240 Self Climbing Scaffold System Powder Coated Loading Bearing Platform

HORIZON FORMWORK CO., LTD.

CB240 Self Climbing Scaffold System Powder Coated Loading Bearing Platform

  • 1
  • 2
  • 3

Brand Name : HORIZON

Model Number : Climbing Formwork CB240

Place of Origin : CHINA

MOQ : 100 sets

Price : pls ask HORIZON

Payment Terms : L/C, T/T

Supply Ability : 100 tons per week

Delivery Time : 20-25 days

Packaging Details : pallets, bundles, bulk

Material : steel waling, climbing bracket, panel strut

OEM : Available

Colour : blue

Working platform : 2.4m

Climbing style : By crane

Application : for high-rise core wall

Finishing : Powder coated, painted, or as per request

Contact Now

High-rise Core Wall Construction Completed by Climbing Formwork CB240

Climbing Formwork CB240 is a crane dependent climbing system and support structure widely used to pour high walls. It performs as a loading-bearing platform as well as a safe working platform. Depending on the length of the platform, the Climbing System is applicable to heights of more than 100 m over ground and allows a maximum formwork height of up to 5.40 m.

Climbing sequence:


Step 1
The first pouring is to be completed by using the proper wall elements and has to be exactly
aligned with adjusting struts.


Step 2
The completely pre-assembled climbing scaffold units consisting of
climbing brackets with plank bottom and bracing have to be attached to the bracket anchoring and secured.
Then the formwork and the move-off carriage together with the aligning beam has to be positioned on the brackets and fixed.


Step 3
After shifting the climbing scaffold unit to the next pouring position the finishing platform is to be mounted to the brackets to complete the climbing system.


Step 4
Release and remove bolts that fixing the positioning anchor point.
Loosen and remove tie-rod
Loosen the wedges of the carriage unit.


Step 5
Retract the carriage and lock it with wedge.
Install upper climbing cones
Loosen wind securing device, if any
Remove the lower climbing cone


Step 6
Adjust the carriage into the common center of gravity and lock it again.
Attach the crane sling to the vertical waling
Remove the security bolts of the bracket
Lift the climbing bracket by crane and attach it to the next prepared climbing cone.
Insert and lock the security bolts again.
Install the wind-load device, if required.

CB240 Self Climbing Scaffold System Powder Coated Loading Bearing Platform
Step 7
Move the carriage back and lock it by wedge.
Clean the formwork.
Install reinforcement bars.

CB240 Self Climbing Scaffold System Powder Coated Loading Bearing Platform
Step 8
Move the formwork forward until lower end rests against top of the finished section of the wall
Adjust formwork vertically by means of push-pull brace.
Fix tie-rods for the wall formwork

CB240 Self Climbing Scaffold System Powder Coated Loading Bearing PlatformCB240 Self Climbing Scaffold System Powder Coated Loading Bearing Platform
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.

Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Who we are:
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects.

What we offer:
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc.
On-site supervising support is available on request.

Why us:
With 10 years of experience, we know exactly what you need;
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request.
Prompt action on customer's requirments.
We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients.

HORIZON FORMWORK, your reliable formwork partner!


Product Tags:

jump formwork system

      

climbing scaffolding system

      
China CB240 Self Climbing Scaffold System Powder Coated Loading Bearing Platform wholesale

CB240 Self Climbing Scaffold System Powder Coated Loading Bearing Platform Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: HORIZON FORMWORK CO., LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0